Contract C18W07 – Office Tower Development at Hong Kong International Airport

June 2020

Design & Build on MEPs for typical office building arrangement to eight storeys developement. Site area is limited within the taxis lay-by & two via-duct (T1 passage & Express Rail); logistics is the main challenge for Main Contractor with us. A lot of constraints to MEPs’ installation is existed when steel structure is applied to the building. Fast track project to MEPs’ installation when quick steel structure erection & less civil finishing work are deployed. In order to satisfy the expected progress, prefabrication to MEPs shall be considered; such as Air Conditioning : chilled water risers with valves, VAV Box with tuned BMS controller, Electrical : lighting fittings with connecting wiring & plug, Floor Box with switches & connecting wiring and Fire Services & Plumbing : pump with associated valves, etc.…….. BS Coordination (strong team from BYME) is paid an important role for the coordination between Architectural, structural & MEPs; using full BIM Modelling on coordination, checking & implementation and also serving the reference to MEPs’ Prefabrication !




Scope of works

Dismantle, supply, delivery, installation, testing and commissioning, of the following building services:
•Mechanical Ventilation & Air-Conditioning Systems (MVAC)
•Electrical Service
•Fire Services Systems (FS)
•Plumbing & Drainage Systems (P&D)

Client Hong Kong Airport Authority
Location Hong Kong International Airport (current Taxi Station)
Main Contractor Dragages HK Ltd.
Architect Ronald Lu & Partners
Consultant Ove Arup & Partners HK Ltd.
Year June 2020