To cope with the operation of the live site, including the betting centre and the live broadcast facility, works were required to be carried out during non-office hours. To maximise work efficiency, BYME worked out an optimal work schedule in terms of manpower and logistics arrangements.
Due to the open-ceiling design, all E&M installations are required to attain the highest level of tidiness and acoustic standards.
Scope of works
Design, Supply, and Installation of Electrical & Mechanical (E&M) Systems
- Full E&M package services for one floor
- Commissioning of chilled water system