Hong Kong Stadium Redevelopment

Mar 1992 - Mar 1994

Until the early 90s, Hong Kong did not have a world class sports stadium to hold prestigious international event. The former stadium did not have sophisticated lighting systems, nor did it have sufficient seats for the spectators. In a bid to improve this situation, The Hong Kong Jockey Club proposed a reconstruction plan of the stadium to the Hong Kong Government.

BYME were appointed to undertake full E&M package of this significant landmark.

BYME delivered a complete E&M package for this redevelopment effort. The scope of this redevelopment effort encapsulates an office ancillary building, a lecture theatre, extensive public address system and a large outdoor screen.




Scope of works

Design, supply, installation, Testing and Commissioning (T&C) and maintenance  of all the following Electrical & Mechanical (E&M) services for facilitating the stadium at maximum seating capacity of 40,000, including 18,260 at the main level, 3,173 at executive level, 18,510 upper level seats and 57 seats for wheelchair users.

  • Air Conditioning and Mechanical Ventilation (ACMV)
  • Electrical and Extra Low Voltage (ELV)
  • Fire services (FS)
  • Plumbing & Drainage (P&D)
Client Leisure and Cultural Services Department and The Hong Kong Jockey Club
Location So Kon Po, Wan Chai, Hong Kong S.A.R.
Main Contractor Dragages Hong Kong Limited
Architect HOK International (Asia/Pacific) Ltd.
Consultant Ove Arup & Partners Hong Kong Ltd.
Year Mar 1992 - Mar 1994