Beas River Equestrian Centre Stable

Mar 2019 - Feb 2020

Beas River Equestrian Centre stable is located in Sheung Shui and provide training to who wants to experience riding. The project consists of supply and install of 8 sets of air-conditioners for UG and LG stable. The works include power supply from main switch room to new MCCB board in stable. The most challenging part for this project is that there are only 10 days for each floor to work inside stable. Installation of all E&M service and completing testing and commissioning for the conditioners are required. In order to meet this extremely tight schedule, all design, routing, installation method, materials, etc. should be ready before the 10 days.




Scope of works

Supply and Installation of Air Conditioner

  • Supply and installation of ceiling mounted A/C equipment and outdoor condensing units
  • Supply and installation of refrigerant pipework system
  • All metal supporting frame work
  • Supply and installation of all electrical works and control system consisting MCB board
  • Supply and installation of air duct and return air plenum

 

Client The Hong Kong Jockey Club
Location Beas River, Sheung Shui
Main Contractor BYME Engineering (HK) Ltd
Year Mar 2019 - Feb 2020