The works include installation, testing and commissioning of the traffic control and surveillance system (TCSS) for the Trunk Road T2 and associated works and integration of Trunk RoadT2 TCSS with the central system of the Tseung Kwan O-Lam Tin Tunnel (TKO-LTT) TCSS.
Scope of works
- Central system software & hardware,
- Traffic control Device
- Communication, CCTV, PABX, PA, Radio, Emergency Telephone and Detection System
- Manual Fallback control, Power distribution and Speed enforcement system
- Operation Facilities
- Government fiber system