BYME is always striving to bring new technology, new ideas and new methods to the projects it undertakes and to provide clients with superior quality solutions to transcend the challenges they face.

 

Always staying several steps ahead of industry challenges, we have been among the first companies to introduce new building services innovations in Hong Kong and Asia and apply them to mega-scale projects for increased productivity, greater cost savings, higher energy efficiency and reduced carbon footprint.

 

Our innovation-driven services are designed to establish a stronger link between the projects we handle and the latest technological knowhow, industry best practices and environmental regulations.

  • DFMA MEP in HK and Singapore

    • BYME strives everyday not only to maintain, but to also excel at DfMA installations on each project. Many DfMA solutions have already been implemented on our sites such as Electrical Plant Skids (RMU, Transformer, LVSB, UPS, Batteries), Whether Proof Electrical Substations (Pillar Boxes), Containerized Generators, Prefabricated Pump Rooms, Tunnel Lighting Modules, Prefabricated Pipes Modules, Prefabricated Cable Containments, Plug Modular Cabling, AHUs with Integrated DDC & Valves. Our engineers are constantly progressing through innovative ideas in order to push the boundaries of accelerating work flow and increasing safety on site. It is our intention to further develop the use of MiC as for instances Toilet Modules on future Building projects and advanced DfMA such as Tunnel Cable Bracket Modules and CP Plant Rooms Modules on CEDD T2 tunnel.

    • Electrical Plant Skid

    • Whether Proof Electrical Substations (Pillar Boxes)

    • Containerized Genset

    • Prefabricated Pump Rooms

    • Prefabricated pipe modules

    Hide

    View Info

  • Hong Kong Jockey Club (HKJC) Racecourse Flood Light Replacements

    • Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.

    • Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.

    • Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.

    • Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.

    • Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.

    • Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.

    Hide

    View Info

  • Centralised Government Godown – first design & build (government project)

    Hide

    View Info

  • Mandarin Oriental Hotel Hong Kong

    • BYME introduced to Off-Site Prefabrication and Modularization to shorten construction time, to achieve better quality control, and to reduce site congestion resulting in enhanced safety

    Hide

    View Info

  • CLP Automated Demand Response

    • BYME developed a load reduction strategy and performed facility audit for over 100 of CLP’s commercial and industrial customers for CLP’s gateway installation of the Automatic Demand Response system.

    • BYME developed a load reduction strategy and performed facility audit for over 100 of CLP’s commercial and industrial customers for CLP’s gateway installation of the Automatic Demand Response system.

    • BYME developed a load reduction strategy and performed facility audit for over 100 of CLP’s commercial and industrial customers for CLP’s gateway installation of the Automatic Demand Response system.

    • BYME developed a load reduction strategy and performed facility audit for over 100 of CLP’s commercial and industrial customers for CLP’s gateway installation of the Automatic Demand Response system.

    Hide

    View Info

  • Kai Tak Cruise Terminal Building

    • Employed a cast-in integrated hanger to avoid drilling works in confined space, which enhanced work efficiency, quality of works and working environment safety.

    • Employed a cast-in integrated hanger to avoid drilling works in confined space, which enhanced work efficiency, quality of works and working environment safety.

    • Employed a cast-in integrated hanger to avoid drilling works in confined space, which enhanced work efficiency, quality of works and working environment safety.

    • Employed a cast-in integrated hanger to avoid drilling works in confined space, which enhanced work efficiency, quality of works and working environment safety.

    Hide

    View Info

  • Trade and Industry Tower

    • All E&M works for the Trade and Industry Tower were in line with both BEAM Plus Platinum and LEED Platinum certification requirements, which was the first Hong Kong government building to achieve such coveted status in sustainability.

    • All E&M works for the Trade and Industry Tower were in line with both BEAM Plus Platinum and LEED Platinum certification requirements, which was the first Hong Kong government building to achieve such coveted status in sustainability.

    • All E&M works for the Trade and Industry Tower were in line with both BEAM Plus Platinum and LEED Platinum certification requirements, which was the first Hong Kong government building to achieve such coveted status in sustainability.

    Hide

    View Info

  • AsiaWorld-Expo

    • Hong Kong’s largest thermal storage plant with a 70MWhr total cooling capacity. By adopting the ice harvesting method at night, the chiller capacity was reduced by around 60%, from 7,100 to 2,810TR, which in turn decreased the initial cost of the chiller plant and reduced maximum power demand charge imposed by the Power Company.

    • Hong Kong’s largest thermal storage plant with a 70MWhr total cooling capacity. By adopting the ice harvesting method at night, the chiller capacity was reduced by around 60%, from 7,100 to 2,810TR, which in turn decreased the initial cost of the chiller plant and reduced maximum power demand charge imposed by the Power Company.

    Hide

    View Info

  • TVB City

    • TVB City was built to a stringent and sophisticated acoustic requirement for studio and recording equipment rooms.

    Hide

    View Info