Innovation
BYME is always striving to bring new technology, new ideas and new methods to the projects it undertakes and to provide clients with superior quality solutions to transcend the challenges they face.
Always staying several steps ahead of industry challenges, we have been among the first companies to introduce new building services innovations in Hong Kong and Asia and apply them to mega-scale projects for increased productivity, greater cost savings, higher energy efficiency and reduced carbon footprint.
Our innovation-driven services are designed to establish a stronger link between the projects we handle and the latest technological knowhow, industry best practices and environmental regulations.
-
DFMA MEP in HK and Singapore
BYME strives everyday not only to maintain, but to also excel at DfMA installations on each project. Many DfMA solutions have already been implemented on our sites such as Electrical Plant Skids (RMU, Transformer, LVSB, UPS, Batteries), Whether Proof Electrical Substations (Pillar Boxes), Containerized Generators, Prefabricated Pump Rooms, Tunnel Lighting Modules, Prefabricated Pipes Modules, Prefabricated Cable Containments, Plug Modular Cabling, AHUs with Integrated DDC & Valves. Our engineers are constantly progressing through innovative ideas in order to push the boundaries of accelerating work flow and increasing safety on site. It is our intention to further develop the use of MiC as for instances Toilet Modules on future Building projects and advanced DfMA such as Tunnel Cable Bracket Modules and CP Plant Rooms Modules on CEDD T2 tunnel.
Electrical Plant Skid
Whether Proof Electrical Substations (Pillar Boxes)
Containerized Genset
Prefabricated Pump Rooms
Prefabricated pipe modules
HideView Info
-
Hong Kong Jockey Club (HKJC) Racecourse Flood Light Replacements
Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.
Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.
Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.
Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.
Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.
Improved illumination performance and energy savings at the HKJC racecourses by replacing flood lights with a modern dimmable flood light system.
HideView Info
-
Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road
A High Voltage Power Distribution system is applied to bridge area while a Step down Transformer is employed for road lights to provide 380V low voltage supply main from a 6600V distribution system.
HideView Info
-
Centralised Government Godown – first design & build (government project)
HideView Info
-
Mandarin Oriental Hotel Hong Kong
BYME introduced to Off-Site Prefabrication and Modularization to shorten construction time, to achieve better quality control, and to reduce site congestion resulting in enhanced safety
HideView Info
-
CLP Automated Demand Response
BYME developed a load reduction strategy and performed facility audit for over 100 of CLP’s commercial and industrial customers for CLP’s gateway installation of the Automatic Demand Response system.
BYME developed a load reduction strategy and performed facility audit for over 100 of CLP’s commercial and industrial customers for CLP’s gateway installation of the Automatic Demand Response system.
BYME developed a load reduction strategy and performed facility audit for over 100 of CLP’s commercial and industrial customers for CLP’s gateway installation of the Automatic Demand Response system.
BYME developed a load reduction strategy and performed facility audit for over 100 of CLP’s commercial and industrial customers for CLP’s gateway installation of the Automatic Demand Response system.
HideView Info
-
Kai Tak Cruise Terminal Building
Employed a cast-in integrated hanger to avoid drilling works in confined space, which enhanced work efficiency, quality of works and working environment safety.
Employed a cast-in integrated hanger to avoid drilling works in confined space, which enhanced work efficiency, quality of works and working environment safety.
Employed a cast-in integrated hanger to avoid drilling works in confined space, which enhanced work efficiency, quality of works and working environment safety.
Employed a cast-in integrated hanger to avoid drilling works in confined space, which enhanced work efficiency, quality of works and working environment safety.
HideView Info
-
Trade and Industry Tower
All E&M works for the Trade and Industry Tower were in line with both BEAM Plus Platinum and LEED Platinum certification requirements, which was the first Hong Kong government building to achieve such coveted status in sustainability.
All E&M works for the Trade and Industry Tower were in line with both BEAM Plus Platinum and LEED Platinum certification requirements, which was the first Hong Kong government building to achieve such coveted status in sustainability.
All E&M works for the Trade and Industry Tower were in line with both BEAM Plus Platinum and LEED Platinum certification requirements, which was the first Hong Kong government building to achieve such coveted status in sustainability.
HideView Info
-
AsiaWorld-Expo
Hong Kong’s largest thermal storage plant with a 70MWhr total cooling capacity. By adopting the ice harvesting method at night, the chiller capacity was reduced by around 60%, from 7,100 to 2,810TR, which in turn decreased the initial cost of the chiller plant and reduced maximum power demand charge imposed by the Power Company.
Hong Kong’s largest thermal storage plant with a 70MWhr total cooling capacity. By adopting the ice harvesting method at night, the chiller capacity was reduced by around 60%, from 7,100 to 2,810TR, which in turn decreased the initial cost of the chiller plant and reduced maximum power demand charge imposed by the Power Company.
HideView Info
-
TVB City
TVB City was built to a stringent and sophisticated acoustic requirement for studio and recording equipment rooms.