E&M works for MRP, GRC and B4 Check Points:
- 51 nos. fan coil, 2 nos CRAC and
- 3 set FM200, 1 set pre-action, AFA device and 350 sprinkler heads.
- 2nos. UPS, 1 nos. ATS, 1200 nos. socket outlets and 300 light fittings.
- Total 4nos. toilet and 2 nos. toilet for detention room.
ABWF works for MRP, GRC and B4 Check Points:
- Total 61 nos. of room approx. 1200m2 block wall.
- Approx 900m2 floor finishes and 2383m2 wall finishes.
Scope of works
Supply and installation of the following services to Western Kowloon Terminus Checkpoint:
- ABWF,
- Mechanical Ventilation & Air Conditioning, (MVAC)
- Electrical Service Systems,
- Fire Service, (FS)
- Plumbing and Drainage System. (P&D)