A&A works for West Kowloon Terminus

Dec 2017 - Sep 2018

E&M works for MRP, GRC and B4 Check Points:

  • 51 nos. fan coil, 2 nos CRAC and 
  • 3 set FM200, 1 set pre-action, AFA device and 350 sprinkler heads.
  • 2nos. UPS, 1 nos. ATS, 1200 nos. socket outlets and 300 light fittings.
  • Total 4nos. toilet and 2 nos. toilet for detention room.

ABWF works for MRP, GRC and B4 Check Points:

  • Total 61 nos. of room approx. 1200m2 block wall.
  • Approx 900m2 floor finishes and 2383m2 wall finishes.




Scope of works

Supply and  installation of the following services to Western Kowloon Terminus Checkpoint:

  • ABWF, 
  • Mechanical Ventilation & Air Conditioning, (MVAC)
  • Electrical Service Systems, 
  • Fire Service, (FS)
  • Plumbing and Drainage System. (P&D)
Client MTR Corporation Ltd.
Location Express Rail Link(XRL) / West Kowloon Terminus(WKT)
Main Contractor BYME Engineering (HK) Ltd.
Architect Aedas
Consultant Meinhadt
Year Dec 2017 - Sep 2018