Goldman Sachs (Asia) LLC office

Nov 2017 - Dec 2020

Design, supply, installation of all E&M services:

  • Supply and install new FCUs and VAV boxes in areas on 59/F and 68/F.
  • Modification and relocation of the existing VAV boxes 
  • Modification and coordination with landlord to modify the landlord BMS and AHU control.
  • of Building Management System (BMS) 
  • Supply and install all chilled water and condensate drain pipe insulation to replace the existing on 62/F, 65/F and 68/F.
  • Supply and install dimming lighting control system with interface with AV systems and motorized blind controller for VC rooms and / or front of houseareas
  • Construction, testing, and system changeover from the existing UPS system to the newly built UPS system



Scope of works

Design, supply & install, the full package Electrical and Mechanical (E&M) services:

  • Mechanical Ventilation & Air-Conditioning (MVAC)
  • Electrical and Extra Low Voltage (ELV)
  • Fire Services (FS)
  • Plumbing & Drainage (P&D)
Client Goldman Sachs Services (Asia) Limited
Location 59/F to 68/F, Cheung Kong Centre 2 Queen Road Hong Kong
Main Contractor IBI Limited
Architect Gensler
Consultant Ove Arup & Partners Hong Kong Ltd.
Year Nov 2017 - Dec 2020