The aim of this project was to improve the ventilation performance at bus terminus and taxi pick-up area including supply & install of 22 nos. and 84 nos. of column-mounted mist fan, 9 nos. of floor mounted fans with 3 sets of water mist system. And also supply 4 nos. of column-mounted mist fan and 1 nos. of floor mounted fans for spare purpose.
In order to avoid disturbance to tourist, well-prepared equipment and material delivery, well-planned logistic and sequence of works were the essence of success of this project.
Scope of works
Supply and install the following Electrical and Mechanical (E&M) works for the ventilation improvement at bus terminus and taxi pick-up area:
- Mechanical Ventilation(MV)
- Electrical System
- Hydraulic System
- Builder Works