Bus Terminus and Taxi Pick-up Area of Hong Kong International Airport

Apr 2017 - May 2018

The aim of this project was to improve the ventilation performance at bus terminus and taxi pick-up area including supply & install of 22 nos. and 84 nos. of column-mounted mist fan, 9 nos. of floor mounted fans with 3 sets of water mist system.  And also supply 4 nos. of column-mounted mist fan and 1 nos. of floor mounted fans for spare purpose.  

In order to avoid disturbance to tourist, well-prepared equipment and material delivery, well-planned logistic and sequence of works were the essence of success of this project.




Scope of works

Supply and install the following Electrical and Mechanical (E&M) works for the ventilation improvement at bus terminus and taxi pick-up area:

  • Mechanical Ventilation(MV)  
  • Electrical System 
  • Hydraulic System  
  • Builder Works
Client Hong Kong International Airport
Location Hong Kong S.A.R.
Main Contractor BYME Engineering (HK) Limited
Year Apr 2017 - May 2018