Residential Development at Discovery Bay North Phase 16

Jan 2016 - Feb 2018

Driven by the success of the previous development phases, Hong Kong Resort Co. Ltd. initiated the construction of Discovery Bay Phase 16, appointing Hsin Chong Construction Group Ltd. as the main contractor to manage the delivery of this pivotal residential project.

BYME managed to secure a portion of the works of this project which  encapsulate Electrical and Extra Low Voltage services for 3 numbers of 16-storey residential buildings consisting of 196 flat units with basement plant rooms.

This project is currently ongoing and scheduled to finish in Q1 2018.




Scope of works

Supply and Installation of following Electrical and Extra Low Voltage (ELV) system for three residential buildings with 196 flat units.

Electrical System

  • LV Distribution
  • LV Generator Set System
  • Lighting and Small Power Installation
  • Cable Containments
  • Earthing & Lightning Systems

Extra Low Voltage (ELV)

  • Area Management System (AMS)
  • Access Control System, Guard/Watchmen Tour System, IP Camera Surveillance, Door Intercom System, Smart Card System, Broadcast System, Single Master Antenna Television and Public Address System
Client Hong Kong Resort Co. Ltd.
Location Discovery Bay, Lantau, Hong Kong S.A.R.
Main Contractor Hsin Chong Construction Group Ltd.
Architect CYS Associates (Hong Kong) Ltd.
Consultant Atkins China Ltd.
Year Jan 2016 - Feb 2018