Driven by the success of the previous development phases, Hong Kong Resort Co. Ltd. initiated the construction of Discovery Bay Phase 16, appointing Hsin Chong Construction Group Ltd. as the main contractor to manage the delivery of this pivotal residential project.
BYME managed to secure a portion of the works of this project which encapsulate Electrical and Extra Low Voltage services for 3 numbers of 16-storey residential buildings consisting of 196 flat units with basement plant rooms.
This project is currently ongoing and scheduled to finish in Q1 2018.
Scope of works
Supply and Installation of following Electrical and Extra Low Voltage (ELV) system for three residential buildings with 196 flat units.
Electrical System
- LV Distribution
- LV Generator Set System
- Lighting and Small Power Installation
- Cable Containments
- Earthing & Lightning Systems
Extra Low Voltage (ELV)
- Area Management System (AMS)
- Access Control System, Guard/Watchmen Tour System, IP Camera Surveillance, Door Intercom System, Smart Card System, Broadcast System, Single Master Antenna Television and Public Address System