Residential Development at Discovery Bay North Phase 18(2a)

Jun 2017 - Sep 2018

Driven by the success of the previous development phases, Hong Kong Resort Co. Ltd. initiated the construction of Discovery Bay Phase 18, appointing Kin Shing General Contractors Ltd. as the main contractor to manage the delivery of this pivotal residential project.

BYME managed to secure a portion of the works of this project which encapsulate Electrical and Extra Low Voltage services for 21 numbers of 2-storey low-rise houses, private house garden, M&E equipment buildings, caretaker’s offices, common area landscape works, roads works and paving works, and other supporting facilities in the area.




Scope of works

Supply and installation of Electrical and Extra Low Voltage 21 numbers of 2-storey low-rise houses

Electrical System

  • LV Switchboard
  • LV Distribution
  • Lighting and Small Power Installation
  • Cable Containments
  • Earthing & Lightning Protection Systems

Extra Low Voltage (ELV)

  • Area Management System (AMS)
  • Access Control System, Guard/Watchmen Tour System, IP Camera Surveillance, Door Intercom System, Smart Card System, Broadcast System, Single Master Antenna Television System
Client Hong Kong Resort Co. Ltd.
Location Discovery Bay, Lantau, Hong Kong S.A.R.
Main Contractor Kin Shing (Leung’s) General Contractors Ltd.
Architect Spiral Architectural Design Ltd.
Consultant Atkins China Ltd.
Year Jun 2017 - Sep 2018