Hong Kong Adventist Hospital is located at Tsuen and it is 2-year term contracts for the maintenance works and repair work for Chiller plant and Mechanical Ventilation Air-conditioning Systems stem at Hong Kong Adventist Hospital – Tsuen Wan.
Scope of works
Maintenance service for the following building services:
- Daily operation services for MVAC system
- Emergency Call Services
- Routine maintenance of weekly, monthly and annual as below equipment::
- Air cooled chiller
- Chilled water pump
- Heat water pump
- Ventilation system
- BMS control system
- Gas boiler system
- VAC system
- Equipment list
- Air-cooled screw chiller ~ 9 sets Total 10547 kW
- Chilled water pump ~ “9 sets
- Heat water pump ~ 3 sets
- Chilled water pump (Heat pump) ~ 4 nos.
- Heat water pump ~ 4 nos.
- Ventilation fan ~Over 20 nos.