A major portion of this contract covers the air-conditioning infrastructure upgrade at Sha Tin Racecourse, with supporting works for the bulk of trades works.
This fast-track project involved numerous system interfacing works, works sequencing, and coordination efforts to avoid any disruptions to the operating racecourse.
Scope of works
Supply, delivery, decommissioning, dismantle replacement and installation of chiller plant:
Structural works & Architectural Builders Works and Finishes (ABWF)
- Structural platform for cooling tower
- Access platforms
- Staircases
Air Conditioning and Mechanical Ventilation (ACMV)
- Water-cooled chillers – 1,000 Tonnes of Refrigeration (TR)
- Condenser and chilled water pumps
- Cooling towers
Electrical and Extra Low Voltage (ELV)
- LV switchboard
- Motor Control Center (MCC)
- Building Management System (BMS)
Fire Services (FS)
- Automatic Fire Alarm (AFA) system
- Diversion and modification of the existing wet fire fighting system
Plumbing & Drainage (P&D)
- Water tank
- Pipe works
- Drain pipe system