Sha Tin Racecourse

Dec 2013 - Aug 2014

A major portion of this contract covers the air-conditioning infrastructure upgrade at Sha Tin Racecourse, with supporting works for the bulk of trades works.

This fast-track project involved numerous system interfacing works, works sequencing, and coordination efforts to avoid any disruptions to the operating racecourse.




Scope of works

Supply, delivery, decommissioning, dismantle replacement and installation of chiller plant:

Structural works & Architectural Builders Works and Finishes (ABWF)

  • Structural platform for cooling tower
  • Access platforms 
  • Staircases

Air Conditioning and Mechanical Ventilation (ACMV)

  • Water-cooled chillers – 1,000 Tonnes of Refrigeration (TR)
  • Condenser and chilled water pumps
  • Cooling towers

Electrical and Extra Low Voltage (ELV)

  • LV switchboard
  • Motor Control Center (MCC)
  • Building Management System (BMS)

Fire Services (FS)

  • Automatic Fire Alarm (AFA) system
  • Diversion and modification of the existing wet fire fighting system

Plumbing & Drainage (P&D)

  • Water tank
  • Pipe works
  • Drain pipe system
Client The Hong Kong Jockey Club
Location Sha Tin, New Territories, Hong Kong S.A.R.
Main Contractor BYME Engineering (HK) Ltd.
Architect Aedas Ltd.
Consultant

WSP (Asia) Ltd.

 

Year Dec 2013 - Aug 2014