Trunk Road T2 and Cha Kwo Ling Tunnel (TRT2) project is a 3.4km long dual two-lane trunk road together with two ventilation buildings. Once completed, TRT2 will be part of the strategic road network, providing an east-west express link between West Kowloon and Tseung Kwan O while relieving the heavily congested road.
Further to the previous contract in 2019 that commissioned BYME to provide design, manufacture, supply, installation, testing and commissioning of Mechanical Systems, we were tasked to provide installation, testing and commissioning of the Traffic Control and Surveillance System.
Scope of works
– Central system software & hardware,
– Traffic control Device
– Communication, CCTV, PABX, PA, Radio, Emergency Telephone and Detection System
– Manual Fallback control, Power distribution and Speed enforcement system
– Operation Facilities
– Government fiber system